Home: organise projects and runs by repository #321

Closed
opened 2026-10-29 22:21:57 -04:00 by cmoriarty · 2 comments
Owner

What happens
Home lists projects and standalone runs in one stream by time. On 2026-10-29 the Breakout project on breakout-planned-3 sat between three quick-fix runs on breakout-planned-2, the previous project's repository, and abandoned leftovers. Nothing said which work belonged together; only a small repository chip on each row. The operator: "The home screen no longer makes sense."

Fix (the operator's direction)
Organise Home by repository. Each repository is a group, holding its projects (their rows, as now) and the runs started on it outside a project. Something live shows within its group, and the group is ordered by its latest activity. Archived runs stay out, as now.

Done when
Home with runs on two repositories, one with a project, shows two groups: each project and each standalone run under its own repository. A browser spec covers it.

**What happens** Home lists projects and standalone runs in one stream by time. On 2026-10-29 the Breakout project on `breakout-planned-3` sat between three quick-fix runs on `breakout-planned-2`, the previous project's repository, and abandoned leftovers. Nothing said which work belonged together; only a small repository chip on each row. The operator: "The home screen no longer makes sense." **Fix (the operator's direction)** Organise Home by repository. Each repository is a group, holding its projects (their rows, as now) and the runs started on it outside a project. Something live shows within its group, and the group is ordered by its latest activity. Archived runs stay out, as now. **Done when** Home with runs on two repositories, one with a project, shows two groups: each project and each standalone run under its own repository. A browser spec covers it.
Author
Owner

Done together with #322 (archive and delete a planned project), as one change: the repository groups carry each project's Archive and Delete.

Done together with #322 (archive and delete a planned project), as one change: the repository groups carry each project's Archive and Delete.
Author
Owner

Done in batch B, merged as #355 (91f4b85f), and live on production: Braid reports commit c00c62f, which includes it. It was checked with the repo's tests and sims before the merge. A live check on vLLM is still to come: trogdor is off the network. Closed at the owner's request.

Done in batch B, merged as #355 (`91f4b85f`), and live on production: Braid reports commit `c00c62f`, which includes it. It was checked with the repo's tests and sims before the merge. A live check on vLLM is still to come: trogdor is off the network. Closed at the owner's request.
Sign in to join this conversation.
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
cmoriarty/braid#321
No description provided.